Articles & News

Spaceport America operations center near completion.

Articles & News

Best Drone Company Rhode Island Connecticut Massachusetts aerial photography

Dome Technologyโ€™s new video highlighting the McInnis Cement dome project in Providence, Rhode Island, USA, is available now. The DomeSilo […]

Dome Technologyโ€™s new video highlighting the McInnis Cement dome project in Providence, Rhode Island, USA, is available now.

The DomeSilo is 134 feet in diameter with a storage capacity is 40,000 metric tons, and McInnis will continue utilizing existing flat storage as well. To maximize the terminalโ€™s abilities, McInnis selected a barge unloader rated at an aggressive 800 metric tons per hour.

 

McInnis Cement Rhode Island

Dome Technology executed a prime contract directly with McInnis for the dome storage, structural steel and mechanical work for pneumatic transport and cement reclaim. More specifically, these tasks required installing a truck lane, steel storage silo, DomeSilo, structural-steel convey piping support, stair platform with connecting structural-steel bridge to the dome apex and a reclaim tunnel. The team also installed an FLSmidth Ful-Floor reclaim system.

In addition, piping on the loading side needed to be routed up and over the existing warehouse; it then was anchored to a structural stair tower as it climbed to the dome apex. Load bearing on the warehouse wasnโ€™t an option, so a new truss and structural-steel supports carry the weight.

โ€œDome Technology has been very good to work with. Theyโ€™ve been very flexible and accommodating,โ€ Demers said.

The new video can be viewed on our Videos page. Also, the full project summary is available here.

 

FB IMG 1602381661406

Construction of the new South Summit Fire Station 41 is complete, and a project summary is available here. South Summit […]

Construction of the new South Summit Fire Station 41 is complete, and a project summary is available here.

South Summit Fire Protection District selected a dome for its new fire station in Kamas, Utah, USA, just 15 miles from Park City.

south summit fire protection district

The two-story station is 13,500 square feet and includes office and storage space as well as ample emergency-vehicle parking. The dome portion is 120 feet in diameter with a total ceiling height of 35 feet. The stationโ€™s size allowed administrators to move their remote offices into the new building as well.

Fire-department personnel hosted an open house Sept. 19. Getting the Kamas Valley community on board with the innovative design was a challenge initially, but theyโ€™ve been pleased with the finished product, especially the interior, Station 41 captain and board commissioner Jackson Coleman said. โ€œItโ€™s going to help bring us into the future,โ€ he said.

According to Park City and Summit County news agency The Park Record, South Summit fire chief Scott Anderson said the completed building will protect against natural disasters and provide an emergency shelter for locals. The project cost $2.6 million; other bids ranged from $8 million to $14 million.

storm-josep-castells-5Mh8iz9vqpY-unsplash

The National Storm Shelter Association is presenting its annual conference as a virtual program November 17. The one-day conference schedule […]

The National Storm Shelter Association is presenting its annual conference as a virtual program November 17. The one-day conference schedule is below:

Click here for PDF: 2020 NSSA conference schedule

Each attendee must register online by clicking here. The email provided at checkout will receive an invite to the event, program info, and updates.

NSSA was formed in 2001 to ensure the highest quality of manufactured and constructed storm shelters that could protect people from injury or loss of life from the effects of tornadoes, hurricanes, and other natural disasters. The association is self-policing to maintain public confidence and respect for the storm-shelter industry.

Dome Technology is a long-standing NSSA member, and sales manager Daren Wheeler sits on the NSSA board as communication vice president.

For more NSSA information, visit nssa.cc.

C:Usersbradley.batemanDesktopTemp Storagechina World Coal S

When approached by a coal company needing to store coal at the mine and wanting to reclaim 100 percent of […]

When approached by a coal company needing to store coal at the mine and wanting to reclaim 100 percent of product without personnel entering the storage facility, the ideal model was clear.

Hypothetically, a DomeSilo thatโ€™s 105 feet in diameter and 150 feet tall would provide the desired storage, and to make things work optimally, a full hopper system with chevrons 25 feet tall would be built directly into the dome, eliminating the need for mechanical systems inside.

โ€œThis doesnโ€™t require any personnel inside the dome โ€” thereโ€™s no mechanical inside the dome to go in and fix. The idea that we can make them really tall and skinny increases the live reclaim,โ€ Dome Technology sales manager Lane Roberts said.

With chevrons hoppers into the dome, product flows easily by way of gravity. And when engineered to the optimal angle, cleaning out the dome is no problem at all, not to mention the likelihood of aging in pile is diminished as product is naturally first in, first out.

But a lot of behind-the-scenes work was required before settling on this customized model.

aging in pile china coal

Engineering the best option

When the customer asked about the optimal guts for its coal storage dome, the first thing the Dome Technology team did was to suggest, based on experience, the number of tunnels thought to be best, which was three. But the second step was determining the minimum angle at which product would flow properly. This angle would determine the angle of chevrons within the dome.

After identifying the hopper angle, Dome Technology calculated exactly how the company could save money while still achieving the reclaim and storage it wanted. The team tested different scenarios, changing up the number of tunnels and the number of chevrons but always keeping that hopper angle in mind. After figuring the costs of the different models, the team was confident more tunnels would cost less than more chevrons.

Chevrons arenโ€™t a cheap install; each one requires massive amounts of concrete and steel. Increasing the number of tunnels would mean the chevrons wouldnโ€™t have to reach so high, dropping that cost substantially.

โ€œWe ran the model, and when we went down to two tunnels from three, the chevrons got so tall and the amount of concrete to form the chevrons doubled,โ€ Roberts said, increasing costs in construction materials (not to mention labor).

Returning to the original recommendation of three tunnels would also provide greater storage since the taller the chevron, the more space it consumes inside the dome. Shorter chevrons free up room for product.

By finding the perfect balance โ€” what number of tunnels best complements the appropriate chevron angle โ€” companies like this can achieve necessary storage and save money. Itโ€™s the principle of design-build at its finest.

 

full-hopper system for coal

 

Why a full-hopper system works well for coal

The full-hopper system provides first-in, first out reclaim desirable with types of coal prone to spontaneous combustion. In general, domes are well suited for coal storage. DomeSilos make more storage possible within a smaller footprint โ€” the facility is built up, not out โ€” so companies can store more in a smaller footprint than warehouses or flat storage would allow. And the DomeSilo naturally protects product too โ€” an important quality when working with volatile coal.

By Rebecca Long Pyper for Dome Technology

Editorโ€™s note: This is an excerpt from a Dome Technology article published in the May/June issue of World Cement. Full text with details about dealing with dust, preventing fire, and preserving product integrity while protecting the environment is available starting on page 46 at https://bit.ly/2gjEVkI.

IMG 4853

Business has not slowed for Dome Technology as bulk companies continue to expand and enhance operations. Here are some of […]

Business has not slowed for Dome Technology as bulk companies continue to expand and enhance operations. Here are some of the recent and current projects:

 

Courtesy CIMA+McInnis

For one company on the East Coast of the United States, Dome Technology fabricated 120,000 pounds of steel to be used as a structural tower in the wood-products industry. The project wrapped up June 23, and fabrication was completed in Dome Technologyโ€™s steel-fabrication shop. Engineers and construction managers worked closely with team members who build features like stair towers, work towers, buildings, conveyor supports, handrails, and walkways to deliver on customer requests and needs.

 

Another current project is a grain DomeSilo in the Midwest, large enough to store 1.3 million bushels of soybeans and corn.

The dome stands 170 feet in diameter and 110 feet tall with a 1.3 million bushel grain capacity and was designed with a no-entry system and bin sweep. Construction on the ring beam and inflation were completed the end of June, and the dome will be operational by the end of September.

The dome was built at an existing company site, and โ€œitโ€™s going to allow them to blend out of this structure and load to rail directly. It will give them the capability to cycle that multiple times,โ€ said sales manager Heath Harrison, adding that the biggest advantage to the upgraded facility will be the no-entry feature. โ€œNow itโ€™s going to be more efficientโ€”less manpower needed.โ€

 

Dome Technology has also contracted with another wood-pellet producer to build a two-dome project in the southern United States. This new facility will feature two storage domes 90 feet in diameter and 135 feet tall. Both will store 10,000 metric tons and are designed with a live floor, โ€œso there is no mechanical extraction or personnel needed to go in the dome,โ€ reducing operational costs significantly, said sales manager Lane Roberts. Product will be reclaimed on a first-in, first-out basis, and the domes will have state-of-the-art safety systems, including aeration and nitrogen, heat sensors, and gas-monitoring sensors.

storm shelter lumberton

โ€™Tis the season for hurricanes, so tropical storms are back in the news. But for members of the National Storm […]

โ€™Tis the season for hurricanes, so tropical storms are back in the news. But for members of the National Storm Shelter Association like Dome Technology, planning for the future and protecting people from natural disaster is a year-round focus.

NSSA membership

The NSSA was formed in 2001 to ensure the highest quality of manufactured and constructed storm shelters that could protect people from injury or loss of life from the effects of tornadoes, hurricanes, and other natural disasters. The association is self-policing to maintain public confidence and respect for the storm shelter industry.

Dome Technology is a long-standing NSSA member, and sales manager Daren Wheeler sits on the NSSA board as communication vice president. The board is comprised of representatives from groups like Huckabee and Vaughn Concrete Products, with Michelle Guymon Barbee of Safe Sheds serving as this yearโ€™s president. NSSA provides objective information about building FEMA-approved storm shelters, and the website provides listings for suppliers and contractors with experience building shelters.

According to Wheeler, the benefit of getting involved in NSSA is โ€œhaving a seat at the tableโ€ to discuss current issues and provide or receive input about what happens in the world of storm shelters. Of interest this year are revisions to ICC 500, the FEMA building code for storm shelters. NSSA members are invited to review the proposed revisions and submit comment.

NSSA also holds an annual convention and produces a regular newsletter. For more information and details about membership, visit www.nssa.cc.

Raw Pic From Brent Toone Jasons Favorite

Join the company thatโ€™s built more than 700 industrial and commercial structures worldwide. Dome Technology specializes in bulk storage, FEMA […]

Join the company thatโ€™s built more than 700 industrial and commercial structures worldwide. Dome Technology specializes in bulk storage, FEMA storm shelters, liquid storage tanks, concrete repair, silo rehabilitation, general contracting, and more. Our business is driven by the pursuit of innovation and advancement, and we are eager to enlist like-minded, motivated individuals to the team.

SEEKING: Structural engineer, mechanical engineer, designer/drafter

REQUIREMENTS:

Structural engineer:

  • Five years minimum experience
  • Proficient in AutoCAD, Excel, Word, Revit
  • Competent in steel and concrete

Mechanical engineer:

  • Five years minimum experience
  • Proficient in AutoCAD, Revit, and SolidWorks/Inventor
  • Competent with material handling, bulk storage, conveyance, dust control, and steel structures

Designer/Drafter:

  • Five years minimum experience
  • Proficient in AutoCAD, Revit, and SolidWorks/Inventor

Please send resumes to mitchell.south@dometechnology.com.

McInnis GC

While Dome Technology worked on the Rhode Island project, McInnis Cement called with an unrelated question: Could Dome Technology also […]

While Dome Technology worked on the Rhode Island project, McInnis Cement called with an unrelated question: Could Dome Technology also install an additional truck loadout lane at an existing terminal in The Bronx, New York?

The Bronx terminal was already a unique facility in a unique position, situated โ€œin deep enough water to enable berthing of large vessels, which is not the case for our major competitors,โ€ Forlini said. Expansion would bolster its potential even more.

McInnis Bronx

Within 130 days of construction starting, Dome Technology completed an additional truck bay for the Bronx facility, including concrete ramps and footing for the structural steel, mechanical equipment, piping and structural-steel installation. The team executed all structural and millwright work, and operations at the facility were not interrupted during construction.

Read more about this project and see additional photos here.

584862EB E2A4 43C1 B072 123FFE974C34

The McInnis Cement project summary is now live at this link. Dome Technology recently completed two projects for McInnis. As […]

McInnis Rhode Island courtesy Waterson Terminal Services

The McInnis Cement project summary is now live at this link.

Dome Technology recently completed two projects for McInnis. As part of its efforts to grow business, McInnis built a facility in Providence, Rhode Island, and after two years in operation, the company was ready for an upgrade featuring a new DomeSilo for cement storage that would supplement existing flat storage.

โ€œThe initial 30,000-ton flat-storage warehouse has been very functional, and it will continue to be used in conjunction with the new storage dome. However, the dome storage was selected for the expansion because the warehouse operations had various limitations. While reclaiming from, it was difficult to offload a ship in a timely fashion,โ€ said project director Dominic Demers, adding that unloading would often pause for 10 to 12 hours a day during warehouse reclaim operations. โ€œFor phase two, we wanted to combine operation flexibility and maximum utilization of our growing marine fleet.โ€

McInnis Rhode Island

Dome Technology completed construction in 2019. The DomeSilo is 134 feet in diameter with a storage capacity of 40,000 metric tons. To maximize the terminalโ€™s abilities, McInnis selected a barge unloader rated at an aggressive 800 metric tons per hour.

While Dome Technology worked on the Rhode Island project, McInnis called with an unrelated question: Could Dome Technology also install an additional truck loadout lane at an existing terminal in The Bronx, New York?

The Bronx terminal was already a unique facility in a unique position, situated โ€œin deep enough water to enable berthing of large vessels, which is not the case for our major competitors,โ€ Forlini said. Expansion would bolster its potential even more.

More details on the Bronx project will be published in our Articles & News section next week. See more of our industrial project summaries by visiting our Industrial Projects page.

First photo courtesy Waterson Terminal Services

lumberton storm shelter and events center

A dome is truly a non-traditional option architecturally, and some might not fancy a domed roof on top of their […]

A dome is truly a non-traditional option architecturally, and some might not fancy a domed roof on top of their commercial building. But a low-profile roof is one way to achieve the same dome benefits with a discreet roofline.

tupelo high school low-profile roof

Dome Technology has developed a low-profile dome concept, which means the roof is still curved but in a more subtle wayโ€”so subtle that itโ€™s often difficult to see the roof at all when approaching the building.

To accommodate a flatter, sleeker dome roof, post-tension reinforcing is often used where the dome and vertical wall interface.

lumberton storm shelter and events center

These roofs can be finished in multiple ways, from tile and pavers to a โ€œgreenโ€ roof made of grass. All options are built upon an impermeable membrane, so leaks are never an issue.

St. Joseph - Tom O'Conner Jr. Athletic Center

For more information, visit our Low-Profile Dome page.

Scroll to Top