Titan America is in the middle of its first year operating with a dome model so nice, they decided to […]

Titan America is in the middle of its first year operating with a dome model so nice, they decided to build it twice.

Titan contracted with Dome Technology to complete the construction of identical DomeSilos in different East-coast locations, one in Florida and the other in Virginia.

Titan America: Tampa, Florida, USA

In the final quarter of 2023, Dome Technology completed a high-capacity DomeSilo for Titan America in Tampa, Florida. The DomeSilo is 142 feet in diameter and 141 feet tall.

The company had multiple priorities for the Tampa location. First, Titan wanted to maximize storage capacity despite the port’s height restriction. In response, Dome Technology fitted the DomeSilo with a low-profile domed roof that might not look like the typical dome but delivers robust strength. This allowed the structure’s vertical walls to reach as high as possible and provide the greatest possible cement storage.

“Our challenge before the dome was a full vessel of one product maxed out our capacity,” said Tampa plant manager Eric Poitras. “The dome now allows us the benefit of discharging two vessels back-to-back with different products without maxing out our storage.”

Second, the DomeSilo needed a robust dust-collection system. But it wasn’t possible to select a typical apex dust collector and still meet the capacity goals and height restriction. So Titan proposed a new idea: venting attached to the side of the dome and down to a dust collector at ground level. EDG Inc. prepared the new design that not only eliminates the need for a large apex platform, but also makes servicing and maintaining the dust collector easier. If needed in the future, this model will allow for ease in changing the dust collector.

Another priority was maximizing the portside property. The site’s soil conditions required a deep foundation to minimize settlement, and an auger-cast piling system with pile cap provided structural security from the ground up. Because of limited space, Dome Technology designed buildings for the Fuller-Kinyon (FK) Screw Pump and FLSmidth Cement Ful-Floor aeration blowers that curve around the DomeSilo exterior rather than standing separate.

Double-sided discharge points at the base of the DomeSilo combined with an FLSmidth Cement Ful-Floor pneumatic reclaim system ensure reclaiming isn’t interrupted if one transport system is temporarily out of order. FK pumps convey product from the DomeSilo to truck loadout silos.

Dome Technology’s scope of work included designing and installing the deep-foundations system, pile cap, dome tunnel, backfill, installation of the FLS aerated reclaim system, and ladder-tower and bridge fabrication, as well as the equipment buildings adjacent to the DomeSilo.

With construction complete, Titan American expects the DomeSilo will improve distribution and product flexibility into the future.

“The dome allows Titan to expand its customer base into West Central Florida by increasing the amount of cement we have available in that market. It also allows Titan the flexibility to bring multiple products into the marketplace,” Poitras said.

Titan America: Chesapeake, Virginia, USA

Dome Technology built another high-capacity DomeSilo for Titan in Chesapeake, Virginia, an identical structure to one built for the company in Tampa during the same time.

Because the Chesapeake site had a similar height restriction to the Tampa site, Titan chose a DomeSilo model that “is not a complete sphere but rather a cylinder with a dome roof,” Titan corporate director of projects Nasos Economou said. Although most of the height comes from vertical stem walls, the structure still benefits from the robust strength and monolithic integrity that comes standard with a DomeSilo.

One of Titan’s priorities was taking full advantage of the portside property. Like in Tampa, Chesapeake’s soil conditions required a deep foundation, and an auger-cast piling system with pile cap was chosen to minimize settlement. The facility also features curved buildings for the FK pump and blowers.

Loading and conveyance models are the same as the Tampa site. In Chesapeake, Dome Technology’s scope of work also included the dome tunnel, backfill, installation of the Ful-Floor reclaim system, and ladder-tower and bridge fabrication and installation.

According to Economou, Titan was able to achieve lower capital requirements by selecting a DomeSilo with its conveyance and reclaim systems. “The dome appears to be the most cost-effective solution for a single product,” he said.

The cement project portfolio

Two major advantages with the design-build model like Dome Technology offers are overall project costs are reduced and schedules are met because each phase of the project is built into the plan. These often yield cost savings and a smoother construction experience. These also contribute to the increasing number of repeat customers year on year.

Besides costing less to build and operate, domes are cost efficient. They are built with locally available concrete and reinforcing steel, and local crews are often hired for assisting in construction, a benefit for city economies as it provides jobs and pumps money back into the marketplace. Also, a dome’s double curvature requires fewer construction materials with significantly less waste, and a dome can be built quickly; one the outer weatherproof membrane is in place, construction moves inside and continues regardless of the weather.

If Dome Technology’s current project list is any indication, there’s no slowdown in sight for the cement industry. In 2023 the team either completed or started on 15 total construction projects, domestic and international, in a wide variety of industries, and cement was most dominant with eight projects. With sophistication on the increase, customers can secure the facility they want, and the process is made easier by selecting a construction company like Dome Technology that can oversee the project from start to finish.

Editor’s note: The preceding is an excerpt from an article published in the BMHR 2024 issue of World Cement.

Herescrop

Dome Technology is pleased to announce that Juan Heres has joined our team as business-development manager. He is an industrial […]

Dome Technology is pleased to announce that Juan Heres has joined our team as business-development manager. He is an industrial engineer by trade, specializing in industrial organization. Juan supplemented his education with additional training in international trade, commercial management, and green hydrogen. He prides himself on staying current with market trends and demands. His full bio and contact information can be viewed here.

Welcome to the team, Juan!

D1E12EAE 9332 47C0 9DA4 1A27CC304C8E

Last year our team completed another FEMA storm shelter, this time for the County of San Patricio in Sinton, Texas, […]

Last year our team completed another FEMA storm shelter, this time for the County of San Patricio in Sinton, Texas, USA. These steel-reinforced concrete structures are engineered to meet FEMA 361, ICC-500, and National Storm Shelter Association standards and provide almost absolute protection in extreme weather events; based on current knowledge of tornadoes and hurricanes, occupants of a safe room built in accordance with these guidelines will very likely be protected from injury or death.

Project summary coming soon!

Canada Yorkton Louis Dreyfus DOM9776 V1 Copy

Transitioning from one stored product to the next within a single storage structure might not be as complicated as you’d […]

Transitioning from one stored product to the next within a single storage structure might not be as complicated as you’d expect. Dome Technology clients often plan their dome projects with this in mind; it’s a smart way to maximize on existing infrastructure and to ensure multiple options are available no matter what the market does.

Here are a few factors to consider for a smooth transition:

  1. To maximize storage, plan a facility designed for the heaviest product. This ensures engineers will design the dome and its systems for the hardest work they might face.
  2. The easiest changes occur between similar products. A company switching from, say, coal to petcoke isn’t going to require the same degree of calculations, reconfiguring, or cleaning as switching from canola to sugar.
  3. To determine if an existing dome can store a different product, look first at the foundation. If, for example, you have a dome that can store 100,000 metric tons of product, you could potentially store 100,000 metric tons of a different product with similar ground loading characteristics with no foundation modifications required.
  4. Next, consider angle of repose. When the stored products have dramatically different angles of repose, it is important to analyze how changing the products will affect the foundation system. For instance, for a dome storing cement clinker with a steep angle of repose—about 45 degrees—switching to cement powder with 10 to 12 degrees will change the loading profile on the foundation system. That’s because the clinker will have a higher load in the middle of the dome floor and lower load on the perimeter while the cement will have pretty much the same loading straight across. “Changes in stored product in the dome can often be easily accommodated through collaboration with our dynamic team,” said Dome Technology CEO Bradley Bateman.
  5. Cleaning the inside of the dome shouldn’t be a deterrent. Either a good spray down with water or a scrub with detergent might be all that’s required. In most cases, any residue left behind would be negligible, but considerations will vary from industry to industry.
  6. If you are planning to switch products in the future, not everything needs to be considered upfront; some features can be added later. For instance, if the new product requires a different conveyance system, that’s a relatively straightforward change—though it obviously comes with a cost.
  7. Something to consider is possible chemical incompatibilities between respective products. For example, some fertilizer will corrode standard rebar; if the previous stored product didn’t have this concern, steps would need to be taken to mitigate corrosion as needed.

IMG 1001

It’s almost time …. In early August, we will announce the location of our 2025 leadership conference. Stay tuned! Dome […]

It’s almost time ….

In early August, we will announce the location of our 2025 leadership conference. Stay tuned!

Dome Technology Leadership Announcement

Web City High School Web City MO 1807 0131

We talk a lot about our industrial projects, but we build sophisticated commercial spaces too. Take a look at our […]

We talk a lot about our industrial projects, but we build sophisticated commercial spaces too. Take a look at our Commercial Projects page to see the custom gyms, auditoriums, storm shelters, churches, and more that we’ve built over the last few decades. See the collage below for just a sampling of the work we’ve done.

05 DJI 0964

Dome Technology has produced a project summary highlighting a second dome built for American Crystal Sugar in Montgomery, Illinois, USA, […]

Dome Technology has produced a project summary highlighting a second dome built for American Crystal Sugar in Montgomery, Illinois, USA, a move that doubled the distribution facility’s storage capacity.

This dome, with its 75,000-metric-ton capacity, was built adjacent to a nearly identical DomeSilo from a 2017 collaboration between the companies. The new dome is 184 feet in diameter and 146 feet tall.

Dome construction was just one part of the project puzzle for Dome Technology. Rail delivers sugar to the site, DomeSilos store it, and trucks primarily distribute it. Dome Technology adapted infrastructure to also provide a rail loadout option so ACS could empty the domes prior to new production runs.

Read the full project summary and see more photos here.

DJI 0424

Dome Technology has completed its project summary for Titan America‘s DomeSilo in Chesapeake, Virginia, USA. The 67,500-metric-ton DomeSilo is identical […]

Dome Technology has completed its project summary for Titan America‘s DomeSilo in Chesapeake, Virginia, USA.

The 67,500-metric-ton DomeSilo is identical to one built for the company in Tampa, Florida, during the same time.

The DomeSilo is 138 feet in diameter and 141 feet tall. Because the Chesapeake site had a height restriction like the Tampa site, Titan chose a DomeSilo model that “is not a complete sphere but rather a cylinder with a dome roof,” Titan corporate director of projects Nasos Economou said. Although most of the height comes from vertical stem walls, the structure still benefits from the robust strength and monolithic integrity that comes standard with a DomeSilo.

One of Titan’s priorities was taking full advantage of the portside property. The site’s soil conditions required a deep foundation to minimize settlement, and an auger-cast piling system with pile cap provided structural security from the ground up. Because of limited space, Dome Technology designed buildings for the Fuller-Kinyon (FK) Screw Pump and blowers that curve around the DomeSilo exterior rather than standing separate.

View the complete project summary here.

default

Dome Technology has completed its project summary for Titan America’s 67,500-metric-ton DomeSilo in Tampa, Florida, USA. The Tampa site was […]

Dome Technology has completed its project summary for Titan America’s 67,500-metric-ton DomeSilo in Tampa, Florida, USA.

The Tampa site was new to Titan, and the company had multiple priorities with its new acquisition. First, Titan wanted to maximize storage capacity despite the port’s height restriction. In response, Dome Technology fitted the DomeSilo with a low-profile domed roof that might not look like the typical dome but delivers robust strength. This allowed the structure’s vertical walls to reach as high as possible and provide the greatest possible cement storage.

“Our challenge before the dome was a full vessel of one product maxed out our capacity,” said Tampa plant manager Eric Poitras. “The dome now allows us the benefit of discharging two vessels back-to-back with different products without maxing out our storage.”

Visit the complete project summary here. Great job, team!

Stacker

Companies today are realizing the benefits of dome storage for fertilizer, starting with the fact that domes boast an indefinite […]

Companies today are realizing the benefits of dome storage for fertilizer, starting with the fact that domes boast an indefinite lifespan.

A concrete structure like a DomeSilo by Dome Technology is ideal for fertilizer storage because corrosion is highly unlikely. In fact, some fertilizer domes built by Dome Technology have been around for 30 years and are still structurally sound.

Concrete may develop hairline cracks that can be penetrated by fine fertilizer dust. This concern can be mitigated by spraying a polyurea coating on the interior surface of the dome. A corrosive-resistant powder can also be mixed into the concrete when pouring the floor.

Water wreaks havoc on fertilizer, and since most fertilizers are hygroscopic, they attract moisture that dissolves the product and corrodes it too, producing weak acids that break down steel. To account for this, corrosive-resistant rebar and/or additional concrete over rebar are used.

To protect product from humidity, a dehumidifier is also highly recommended. Housed on top of the dome, humidity in the headspace can be controlled, and the ideal interior climate can be maintained. Humidity monitors can also be installed, allowing site managers to survey and adjust interior conditions.

Protection from rust and moisture on the storage side is one thing, but there are ways to extend a facility’s life span by protecting other components from corrosion too. While many fertilizer companies utilize front-end loaders, those who select integrated reclaim systems can protect metal components from rust in multiple ways. Stainless steel is always an option, especially ideal for food- or pharm-grade fertilizer products, but can be cost prohibitive. Another route is to paint the metal so corrosion isn’t an issue; the main thing is to keep up on maintenance so chips and scratches in the surface don’t allow an access point for moisture.

Decisions about moving product require their own attention. When done right, an efficient handling system promises a boosted bottom line and fewer system hiccups. By striking the right combination of features, fertilizer companies can achieve a completely custom, efficient handling system that functions seamlessly and yields a greater return on investment.

 

Five key benefits of dome storage + the right handling system

Once a storage facility has been selected, the customer’s next step is to analyze handling options — hourly and annual tonnage requirements, throughput needs and more. The standard handling mechanism outside the storage facility is straightforward — usually conveyance via belt and reclaim via front-end loader — so major material-handling decisions must be made for systems within the structure. Here are five considerations when planning a project:

  1. Select the right storage facility configuration. Many companies store bulk amounts within separate domes, then mix them in smaller batching facilities outside the storage areas. Domes also offer the most economical value for large dry-bulk storage, so other types of small structures are commonly used for storing smaller quantities or when mixing fertilizer within the structure.
  1. Understand the product. With a basic understanding of the stored product, engineers can begin delivering on other requests — upstream and downstream processes, hourly and annual tonnage requirements, site-specific safety requirements, accommodating preferred vendors for mechanical components and more.

Whether or not the stored product has been prilled will affect the handling-system design. Prilled product is more susceptible to degradation, so gentle handling is a must — but gentle can cost more. Unformed or unprilled product doesn’t require gentle handling, so a low-tech, less expensive option is one way to cut costs. Both prilled and unprilled fertilizers are corrosive, so stainless or non-corrosive finishes are the standard.

  1. Control humidity. Water wreaks havoc on fertilizer; since most fertilizers are hygroscopic, they attract moisture that dissolves the product and corrodes it too, producing weak acids that break down steel and damage concrete. Dome customers are advised to allot a portion of the budget to corrosive-resistant rebar and/or additional concrete over rebar.

To protect product from humidity, a dehumidifier is highly recommended. Housed on top of the dome, humidity in the headspace can be controlled, and the ideal interior climate can be maintained. Humidity monitors can also be installed, allowing site managers to survey and adjust interior conditions.

  1. Deal with fines. Smaller particles ought to be evenly dispersed in the storage; if not, fines will concentrate in the middle of the pile and glue together more firmly than solid, larger particles — and that can cause serious reclaim problems. Selecting the right distribution spout can ensure that solid, larger particles are more evenly mixed with fines. A common solution is an umbrella spout that dumps fertilizer onto an umbrella-like structure and fans out the product. Not only is this option effective, but it’s relatively inexpensive.
  1. Identify maximum stacking depth. When stacked too tall, some fertilizers will crystal-bridge together, making reclaim difficult. A point-level monitor tracks the stack so site managers know how much they’re storing and can adjust throughput as needed.

Case study: Fabrication for a facility upgrade at one Idaho mine

Fabrication is a necessity for massive projects like upgrading a fertilizer storage facility. For decades, Dome Technology has specialized in bulk storage, but in recent years the team has turned up the dial on fabrication know-how. Today, Dome Technology builds structural-steel features — ladders, catwalks and the like — to support fertilizer-storage facilities.

In early 2023 one longtime fertilizer-mining company in Idaho chose to transition from truck unload — the model they’d used for decades — to rail unload. Instead of trucking and dumping with smaller conveyors to the stacker, a rail pit was installed; Dome Technology, then, increased the capacity by fabricating a new upgraded trans conveyor and the stacker system.

“The additional capacity of the new rail unloading was way beyond what the existing conveyors for the facility could accommodate,” Dome Technology sales manager Heath Harrison said. “We built replacement conveyors that could increase the rate to handle the rail receiving as opposed to the original truck transfer the mine had depended on.”

Product stacking in this new configuration was also a major consideration. The mining company utilizes an outside pile, allowing their plant to stockpile product when operations pause for the winter. The previous configuration featured a hammerhead stacker that moved back and forth. Dome Technology’s scope of work also included upgrading the stacker equipment, including everything from the rail pit to the stacker. These improvements will allow the company to control how product is stored, building up the pile where necessary and boosting operational flexibility. The new version tilts and spans the entire front side of the storage.

Additionally, a sampler was installed for pulling and testing material, and a front-end loader hopper feed allows entry for cleanup. Trucks and front-end loaders have full access to the facility for reclaim.

The company now has a state-of-the-art staging area that complements anticipated business growth and provides a year-round buffer. “What this allows the mine to do is stockpile material to get them through the winter,” Harrison said.

Dome Technology collaborates frequently with bulk-handling expert Bruks-Siwertell. For this project, Bruks-Siwertell completed the design work, then handed over plans to Dome Technology for fabrication and installation. Additionally, Dome Technology provided assembly and erection of the boom tower and fabricated steel components like ladders, staircases, decking and handrails.

“We do build domes, but this is a great example of how we are a turnkey facility provider and can supply storage, conveyance and fabrication,” Harrison said.

Turnkey construction: Simplifying a project

Large storage projects can seem daunting — they require significant time and a considerable financial investment. That’s why many fertilizer companies opt to partner with a turnkey construction company to manage the full project scope. By working with a one-stop shop, customers receive an innovative facility because each element is planned with the others in mind.

Here are the typical first steps in building a turnkey facility — the initial items a customer defines:

  1. A company provides the basics: capacity, geographical and geological position, existing or new facility, potential for growth, product consideration and desired or required operations.
  1. This information will drive the dome dimensions, and “because the dome is so flexible, that is where we’ll find the most economical dimensions,” Harrison said.
  1. Once plans are approved, it’s full steam ahead. Dome Technology provides geotechnical analysis to determine foundation type; deep foundations aren’t the only option. The team is also knowledgeable in stored-product considerations, optimal design for product integrity and subcontractor management. In addition to the storage structure itself, the team can provide the conveying systems as well as the structural steel, manufactured in its shop located on the corporate campus.

Working alongside an expert team can result in a completely custom facility where serious business goals can be achieved.

Editor’s note: The preceding is an article published in the May/June 2024 issue of World Fertilizer. 

Scroll to Top